Being the 1st stage in the simplified V-model approach, WP1 is dedicated to requirements and specifications. Starting from users’ needs for the different demonstrators in the Research & Innovation streams (RISs), expressed either by end-users that are part of the consortium or by their clients and partners, the consortium will derive requirements and specifications. Particular attention will be paid to requirements and specifications related to the interfaces (e.g., compliance with existing standard to ensure easy integration and further adoption by the market without costly redesign) and to the data requirements, especially for all demonstrators that require AI/ML developments. WP1 will be organized in 6 tasks, following the 5 technical RISs, as well as the requirements for the 6th (non-technical) RIS.
Following the different RISs, and considering the requirements and specifications defined in WP1, WP2 will design the different demonstrators, hardware, firmware, middleware and software, where appropriate. Particular attention will be paid to the design of the interfaces and data structure to ensure seamless integration after development in WP3. WP2 will be organized in 5 tasks, with one task per RIS
The objectives of the WP3 include the following aspects:
RISs aim to reach MOSAIC vision, by developing novel solutions such as advanced sensor fusion techniques, adaptable software architectures and platforms, modular decision-making frameworks, and explainable AI models. Outcomes of RISs will be showcased on multiple demonstrators. The demonstrator will vary between virtual implementation in simulation environments, lab demonstrators and physical demonstrators.
This work package is focusing on verifying and validating the newly developed solutions. Assessment of the performance of the systems and subsystems integrated within WP3 will be carried out. Their functionality and characteristics will be examined in alignment with the results obtained from analyzing hardware, software, and digital twins.
The objectives of this work package include the following aspects:
The objectives of this work package include the following aspects: